Schedule Inspection
Use the calendar below to select a date & time convenient for you.
APPOINTMENT WINDOW: tech arrival time may vary by +/- 15 minutes (if your appointment is 9:00am, arrival window would be 8:45-9:15am)
If your Tulsa roof already has asphalt shingles, Oklahoma requires a full tear-off before new shingles go on.
So if you get a bid for a second layer, that bid does not match state rules for asphalt shingle roofs.
Here’s the short version:
In other words:
Your project starts with removal, not cover-up.
That matters because hidden deck damage, failed flashing, trapped moisture, and extra roof weight are all easier to deal with when the old roof is gone.
Quick comparison
| Item | Second Layer | Full Tear-Off |
|---|---|---|
| Oklahoma rule for asphalt shingles | Not allowed | Required |
| Deck inspection | Limited | Direct view |
| Hidden damage | Can stay covered | Can be found and fixed |
| Roof weight | More weight added | Old material removed |
| New roof surface | Can be uneven | Cleaner base |
We want you to know one thing before you sign anything:
For an asphalt shingle roof in Tulsa, replacement means tear-off first.

Oklahoma’s roofing rules draw a clear line between a recover and a replacement.
For asphalt shingles, that difference matters.
In code language, a roof recover means putting new roofing on top of the existing roof without taking the old roof off first.
A full replacement means a complete tear-off, where the existing materials are removed down to the deck before the new installation starts.
For asphalt shingles, Oklahoma requires replacement.
If asphalt shingles are already on the roof, Oklahoma’s amended rule does not allow a recover.
So the job must be a full replacement.
In plain English: the old shingles come off first.
That is why the next step is a full tear-off.

In Oklahoma, you can’t put a second layer of shingles on an asphalt shingle roof.
That alone makes a full tear-off the right path.
But code is only part of the story.
A tear-off lets us see the roof deck with nothing hiding underneath.
And that matters.
Because a roof replacement should fix the problems the old roof was covering up, not bury them under new shingles.
One of the biggest problems is rotten decking.
You won’t spot that from the surface.
A roof can look fine up top while the wood underneath has already started to break down.
The same thing happens with failed flashing around chimneys and in valleys.
Those areas are common leak points.
If the flashing has gone bad, laying new shingles over the old roof doesn’t solve the issue.
It can hide it for a while.
There’s also the moisture problem.
When old shingles hold trapped moisture and a new layer goes over them, that moisture gets stuck in place.
Over time, the roof deck underneath can wear out faster.
Then there’s the extra weight.
A second layer adds more load to the roof structure.
A full tear-off removes the old material first, so the roof stays at its original design load.

Here’s the plain-English difference:
| Factor | Overlay (Roof-Over) | Full Tear-Off |
|---|---|---|
| Code compliance | Not allowed for an asphalt shingle roof in Oklahoma | Fits code requirements |
| Ability to inspect decking | Hides rot and damage | Full visibility to find and fix soft spots |
| Hidden damage risk | High, because it can conceal leaks and trapped moisture | Lower, because issues are addressed before install |
| Roof surface condition | Often uneven and can show through as old bumps | Smooth, clean starting point |
| Structural load | Adds weight to the existing structure | Removes the old material and avoids added load |
| Long-term serviceability | Harder to trace new leaks to their source | Easier to maintain and repair |
A full tear-off also gives us a clean deck for new underlayment and drip edge.
That’s the right way to prep a roof before new shingles go on.


Tulsa Asphalt Shingle Roof Replacement: Full Tear-Off Process
Once a tear-off is on the table, the next step is pretty simple: what actually happens during the job?
It starts with the tear-off.
We remove the old shingles and underlayment all the way down to the roof deck.
With the deck exposed, we inspect it for rot, water damage, and weak or unstable areas.
If any decking is damaged, we repair or replace it before the new shingles go on.
Once the deck is solid, we install the new roofing system.
The biggest swing factor is what the tear-off exposes.
That’s because some problems stay hidden until the old roof comes off.
Roof shape and site access can also affect the amount of work.
The number and condition of chimneys, walls, and plumbing vents matter too, since they affect how much flashing work the roof needs.
Your material choices can shift the scope as well.
Different underlayments, flashing details, and other roofing parts can add work or cut it down.
That’s usually the moment when the full replacement plan comes into focus.

Oklahoma does not allow a second layer on an asphalt shingle roof.
So if you get a roof-over bid for asphalt shingles, that price includes work the state does not permit.
Oklahoma also moves to the 2024 code editions on September 14, 2026, so it’s smart to confirm which code edition your permit falls under.
Here’s what that means for your bid.
A full tear-off is the required path for asphalt shingles in Oklahoma.
That also gives your roofer a clear look at the roof deck, which matters more than most people think.
If there’s hidden rot or damage under the old shingles, it can be found and fixed before the new roof goes on.
For the source of the rule and how it fits the broader code setup, see our guide to what building code applies to roofs in Oklahoma.
We have served Tulsa since 1987.
If you want the roof checked before replacement starts, request a free inspection.

Confirm the installation code for your roof with the City of Tulsa or the Construction Industries Board.
We’ve served Tulsa since 1987, and we provide roof inspections that help you see the current condition of your roof in plain terms.
Arrowhead Roofing is not a licensed public adjuster.
We do not negotiate insurance claims.
What we do is inspect roofs, document storm damage, and meet with insurance adjusters to support the inspection process.
Oklahoma does not allow an additional layer of asphalt shingles on a roof that already has shingles in place.
To check the current rules for your job, contact the City of Tulsa or the Construction Industries Board.
We’ve served the Tulsa metro since 1987.
Request a free inspection to get started.
Tear-off can change the final roof bid because the rule on a second shingle layer affects what work a contractor can legally include.
If a bid assumes the crew will install new shingles over the old roof, that price may not line up with what the code allows.
The sources provided here do not verify that rule.
Please confirm it with the Oklahoma Administrative Code, Oklahoma Statutes, or the City of Tulsa.