Schedule Inspection
Use the calendar below to select a date & time convenient for you.
APPOINTMENT WINDOW: tech arrival time may vary by +/- 15 minutes (if your appointment is 9:00am, arrival window would be 8:45-9:15am)
Home » Roofing Guide » Codes & Specs »
Three bundles cover one square, or 100 square feet of finished roof, for most asphalt shingles including three-tab and architectural laminate. Heavier designer profiles take four or five. Arrowhead Roofing has ordered shingles by the truckload for Tulsa roofs since 1987, so these are the numbers we buy against.
Note: this is a general guide only. Coverage, piece counts, and weights vary by product, and your installer should verify them against the manufacturer’s published specification sheet for the shingle actually going on your roof. GAF publishes those, and so does every other major manufacturer.

Here is what a square looks like across the four profiles, using the manufacturers’ published figures.
| Shingle Type | Bundles per Square | Pieces per Square | Coverage per Bundle |
|---|---|---|---|
| Three-tab | 3 | 79 | 33.3 sq ft |
| Architectural laminate | 3 | 64 | 33.3 sq ft |
| Designer, slate profile | 4 | 56 | 25 sq ft |
| Designer, shake profile | 5 | 72 | 20 sq ft |
A square is a unit of roof area, not a unit of packaging. It is 100 square feet of finished, weather-exposed roof surface, and it is how every roof in the trade is measured, ordered, and priced.
Bundles are how the shingles are packaged so one person can carry them. Three bundles per square is the norm because a bundle much heavier than that becomes unsafe to hand up a ladder.
The two numbers that move are the profile and the waste factor. Profile decides bundles per square. Waste decides how many squares you order for a roof of a given size, and on a cut up roof that difference is large.
Manufacturers do not print shipping weight on most specification sheets, so treat the figures below as planning ranges rather than published values. They are what we use for staging and for deck load conversations.
| Shingle Type | Approximate Bundle Weight | Approximate Weight per Square |
|---|---|---|
| Three-tab | 50 to 70 lb | 150 to 210 lb |
| Architectural laminate | 65 to 85 lb | 195 to 255 lb |
| Designer, slate profile | 75 to 90 lb | 300 to 360 lb |
| Designer, shake profile | 70 to 85 lb | 350 to 425 lb |
Two practical consequences. A designer shingle can put close to double the dead load on a structure that a three-tab roof did, which is a conversation to have before the order, not after.

And loading matters. Thirty squares of laminate is roughly three and a half tons of material, and it does not all go in one place on the deck.
Every hip, valley, and rake means cutting shingles, and the offcuts go in the trailer. That is the waste factor, and it is the line homeowners most often suspect of being padding.
Aerial measurement reports quote materials at four waste levels, with the suggested factor driven by roof complexity. The report itself is explicit that the figure is guidance only.
| Roof Complexity | Typical Waste Factor | What It Looks Like |
|---|---|---|
| Simple gable | 0 to 8% | Two planes, no valleys, straight rakes |
| Hip roof | 8 to 13% | Cuts on four sides, ridge and hip cap |
| Multiple gables and valleys | 13% | Several intersecting planes |
| Cut up, many facets | 18% | Dormers, turrets, short runs, long valley lengths |
Here is an aerial measurement from a Broken Arrow home we roofed, with the arithmetic run out.
Step one, convert to squares. 4,262 divided by 100 is 42.6 squares of actual roof surface.
Step two, apply waste. Fifteen facets and 116 feet of valley is a cut up roof, so 13% is the right factor here rather than 8%. 42.6 times 1.13 is 48.2 squares.
Step three, convert to bundles. Architectural laminate at three bundles per square is 48.2 times 3, which is 145 bundles, and orders round up to the full square, so 49 squares and 147 bundles.
Step four, the things that are not field shingles. 224 feet of ridge and hip needs cap, and 215 feet of eave needs starter. Neither comes out of the field shingle count, and both are separate line items.

The gap between 42.6 and 49 is not padding. It is 116 feet of valley cuts.
A good part of the older Tulsa housing stock was originally roofed in wood shake, and some of it still is under a layer of asphalt.
The measurement converts cleanly, because a square is a square regardless of what is on it. What does not convert is the deck. Wood shake was commonly installed over spaced sheathing, boards with gaps between them, because the shakes needed to breathe.
Asphalt shingles cannot go on that. IRC R905.2.1 requires asphalt shingles to be fastened to solidly sheathed decks, so a shake to asphalt conversion usually means sheeting the entire roof before a single shingle is ordered.

That is a real and sometimes large cost, and whether a carrier covers it on a storm claim is a code question rather than a preference question. We cover that in the ordinance and law answer.
The gap between the size of a house and the size of a shingle order comes from three places. None of them is guesswork.
Roof area is not the same as the footprint of the house. A 7/12 pitch adds roughly 16% to the plan area, and a steeper roof adds more, which is why a satellite measurement and a tape measure across the driveway do not agree.
Two roofs of identical area can differ by ten squares in the order if one is a simple gable and the other has fifteen planes. Complexity drives waste far more than size does.
These are bought separately and they are not optional. Cap comes in bundles rated by linear feet rather than by square, so 224 feet of ridge and hip is its own calculation.
We order shingles in bulk, by the truckload, shipped direct to our yard rather than picked up from a supply house as jobs come up.
That earns better pricing, which gets passed on, and it means we can tell you what a square actually costs to stock rather than quoting from a price sheet. It also means material is on hand after a storm, when everyone else is waiting on a distributor.
Between 224 and 360 per square in standard application depending on the shingle profile, and half again as many on the enhanced pattern we install. How many nails per shingle does code require? has the full breakdown.
Aerial reports measure the roof surface, but they can miss low slope sections, obstructions, and recent additions, and they do not price waste. A field measurement reconciles the two, which is why we do both.
You pay for the material the roof consumes, and offcuts at valleys and rakes are consumed. On a simple gable the factor is small, and on a fifteen facet roof it is the difference between finishing and running short.
A roof is cut to fit and the offcuts cannot be reused, and ordering short is worse than ordering long because a top-up delivery can arrive on a different colour code. Why does my roof estimate include a waste factor? covers both reasons.
The two answers that pair with this one are what holds those shingles down and how many fasteners each one takes, and who pays when the deck underneath has to be replaced to meet code.
Having installed thousands of roofs in Tulsa and northeast Oklahoma since 1987, we have the local experience that matters to you. Book a free roof inspection and you will get the square count, the waste factor, and the reason for both in writing.